Key points for the installation of crushing equipment include:
Equipment Foundation: The equipment should be installed on a level concrete foundation and secured with anchor bolts to ensure stability.
Equipment Positioning: During installation, ensure that the main unit is positioned vertically relative to the horizontal plane to maintain stability.
Bolt Inspection: Once installation is complete, check all bolts for looseness and ensure that the main unit's access doors are securely fastened; tighten any components as necessary.
Power Supply Configuration: Properly set up the required power supply lines and control switches, ensuring that all electrical connections are secure and safe.
Trial Run: After all checks are finished, conduct a no-load trial run; proceed to full-scale production only after confirming that the equipment is operating correctly.